Show
Sort by
-
Determination of standard times of nursing activities based on a Nursing Minimum Dataset
-
An integrated change framework for setup reduction
-
The synergy between the human factors body of knowledge and the design for fast changeover of production equipment
-
The development of a workload indicator for nursing based on the Belgian Nursing Minimum Dataset
-
A quantitative approach for scheduling activities to reduce set-up in multiple machine lines
-
Set-up reduction for lean cells and multi-machine situations
-
Using Time Studies for Quantifying Waste and Improvement Opportunities in Work Methods
-
A Multi Goal Optimization Model for Set-Up Reduction of Machine Lines
-
Assessing maturity and effectivenes of enterprise performance measurement systems
-
Shortening the time to archieve standard output rates for manual labor in manufacturing
-
Human factors aspects in set-up time reduction
-
A Quantitative Approach for Set-up Reduction of Machine Lines
-
Application of an Integrated Tool for Assessing Performance Measurement System Effectiveness and Maturity
-
Using value stream mapping to redesign engineering project work
-
Effects of age on adjustment of gait parameters and muscle activity
-
Introduction of human factors principles in the design for fast changeover
-
Integrated enterprise transformation: case application in engineering project work in the Belgian armed forces
-
Set-up Reduction for Multi-Stage Manufacturing Lines - A case study
-
Reducing Set-up Times of Manufacturing Lines
-
Rules for integrating fast changeover capabilities into new equipment design