Show
Sort by
-
Optimizing extracurricular activities assignment and related logistical deployment cost between collaborating schools
-
Reducing the feasible solution space of resource-constrained project instances
-
A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks
-
Analysis of the impact of corrective actions for stochastic project networks
-
- Journal Article
- A1
- open access
A study on policy decisions to embed flexibility for reactive recovery in the planning and scheduling process in operating rooms
-
Risk response budget allocation based on fault tree analysis and optimization
-
- Journal Article
- A1
- open access
360 Degrees rumor detection : when explanations got some explaining to do
-
- Journal Article
- A1
- open access
Dynamic personnel rescheduling : insights and recovery strategies
-
- Journal Article
- A1
- open access
Explainability through uncertainty : trustworthy decision-making with neural networks
-
On the summary measures for the resource-constrained project scheduling problem