A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem
-
Dynamic personnel rescheduling : insights and recovery strategies
-
- Journal Article
- A1
- open access
A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
-
Manufacturing project scheduling considering human factors to minimize total cost and carbon footprints
-
Mathematical formulations for project scheduling problems with categorical and hierarchical skills
-
Using earned value management and schedule risk analysis with resource constraints for project control
-
An efficient genetic programming approach to design priority rules for resource-constrained project scheduling problem
-
A reduction tree approach for the discrete time/cost trade-off problem
-
- Journal Article
- A1
- open access
The bilevel optimisation of a multi-agent project scheduling and staffing problem
-
Stability and accuracy of deterministic project duration forecasting methods in earned value management
-
New summary measures and datasets for the multi-project scheduling problem
-
Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
-
Various extensions in resource-constrained project scheduling with alternative subgraphs
-
A theoretical framework for instance complexity of the resource-constrained project scheduling problem
-
- Journal Article
- A2
- open access
Essential skills for data-driven project management : a classroom teaching experiment
-
Detecção automática de regra de prioridade : com melhor desempenho em cronogramas de projeto com problemas de restrição de recursos
-
- Journal Article
- A1
- open access
An analysis of network and resource indicators for resource-constrained project scheduling problem instances
-
- Journal Article
- A1
- open access
Generalized Multi-Scale Stochastic Reservoir Opportunity Index for enhanced well placement optimization under uncertainty in green and brownfields
-
- Journal Article
- A1
- open access
A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing
-
Using Schedule Risk Analysis with resource constraints for project control
-
A new algorithm for resource-constrained project scheduling with breadth and depth of skills
-
- Journal Article
- A1
- open access
Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach
-
Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem
-
- Journal Article
- A1
- open access
An analytical model for budget allocation in risk prevention and risk protection
-
Practical application of reference class forecasting for cost and time estimations : identifying the properties of similarity
-
Project recovery : project failures and how to get rid of them
-
Project schedule performance under general mode implementation disruptions
-
- Journal Article
- A1
- open access
A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
-
Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs
-
Optimizing production capacity and safety stocks in general acyclic supply chains
-
- Journal Article
- A1
- open access
The impact of a limited budget on the corrective action taking process
-
- Journal Article
- A1
- open access
Integrating corrective actions in project time forecasting using exponential smoothing
-
Going to the core of hard resource-constrained project scheduling instances
-
A reconfigurable model for implementation in the closing phase of a wind turbines project construction
-
- Journal Article
- A1
- open access
Forecasting the project duration average and standard deviation from deterministic schedule information
-
Analysing the impact of alternative network structures on resource-constrained schedules : artificial and empirical experiments
-
A project buffer and resource management model in energy sector : a case study in construction of a wind farm project
-
Multi-mode schedule optimisation for incentivised projects
-
Resource-constrained multi-project scheduling : benchmark datasets and decoupled scheduling
-
- Journal Article
- A1
- open access
The impact of applying effort to reduce activity variability on the project time and cost performance
-
Performance comparison of activity sensitivity metrics in schedule risk analysis
-
Resource-constrained project scheduling with activity splitting and setup times
-
Strategies for project scheduling with alternative subgraphs under uncertainty : similar and dissimilar sets of schedules
-
A study of the critical chain project management method applied to a multiproject system
-
- Journal Article
- A1
- open access
A statistical method for estimating activity uncertainty parameters to improve project forecasting
-
- Journal Article
- A1
- open access
A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
-
An agency perspective for multi-mode project scheduling with time/cost trade-offs
-
A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
-
Fitting activity distributions using human partitioning and statistical calibration
-
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models
-
Tolerance limits for project control : an overview of different approaches
-
Computing project makespan distributions : Markovian PERT networks revisited
-
Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities
-
Maximising the weighted number of activity execution modes in project planning
-
An empirical validation of the performance of project control tolerance limits
-
A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem
-
An exact composite lower bound strategy for the resource-constrained project scheduling problem
-
Planning projects with scarce resources : yesterday, today and tomorrow's research challenges
-
A tool to test and validate algorithms for the resource-constrained project scheduling problem
-
The influence of project resource allocation on the resource capacity of the business processes
-
A buffer control method for top-down project control
-
Optimised scheduling for weather sensitive offshore construction projects
-
Extensions of earned value management : using the earned incentive metric to improve signal quality
-
A nearest neighbour extension to project duration forecasting with Artificial Intelligence
-
Combining EDM and EVM : a proposed simplification for project time and cost management
-
- Journal Article
- A4
- open access
Earned duration management for a student association project
-
A parallel multi-objective scatter search for optimising incentive contract design in projects
-
The integration of constrained resources into top-down project control
-
On the resource renting problem with overtime
-
The art of project management : a story about work and passion
(2017) -
Taking sound business decisions : from rich data to better solutions
(2017) -
On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
-
- Journal Article
- A4
- open access
About academic research on earned value management inspired by the college of performance management
-
A resource type analysis of the integrated project scheduling and personnel staffing problem
-
A metaheuristic solution approach for the time-constrained project scheduling problem
-
Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting
-
Capital- and resource-constrained project scheduling with net present value optimization
-
- Journal Article
- A1
- open access
Project regularity : development and evaluation of a new project characteristic
-
- Journal Article
- A4
- open access
On the use of empirical or artifical project data
-
How many types of critical activities exist? A conjecture in need of proof
-
A study on complexity and uncertainty perception and solution strategies for the time/cost trade-off problem
-
Do research, create knowledge, feed your talent: an overview of research at Operations Research & Scheduling
(2016) -
An overview of project data for integrated project management and control
-
Integrated project management sourcebook : a technical guide to project scheduling, risk and control
(2016) -
An approach using SAT solvers for the RCPSP with logical constraints
-
- Journal Article
- A1
- open access
Empirical perspective on activity durations for project-management simulation studies
-
Incentive contract design for projects : the owner׳s perspective
-
A comparative study of Artificial Intelligence methods for project duration forecasting
-
An exact algorithm for an integrated project staffing problem with a homogeneous workforce
-
A scatter search for the extended resource renting problem
-
Buffer monitoring: setting thresholds for corrective actions
-
- Conference Paper
- C3
- open access
Capital constraints and net present value optimization in project scheduling
-
Flexibility by design for the MRCPSP
-
Payment models and net present value optimization for resource-constrained project scheduling
-
Practical application and empirical evaluation of reference class forecasting for project management
-
Stability of earned value management : do project characteristics influence the stability moment of the cost and schedule performance index
-
On the use of multivariate regression methods for longest path calculations from earned value management observations
-
Introdução à duração agregada
-
A heuristic procedure for the personnel task re-scheduling problem
-
The art of project management: a story about work and passion
(2015) -
Study of the stability of earned value management forecasting
-
Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem
-
Decomposition-based heuristics for the integrated physician rostering and surgery scheduling problem
-
A comparison of the performance of various project control methods using earned value management systems
-
Taking sound business decisions : from rich data to better solutions, OR-AS
(2015) -
- Journal Article
- A1
- open access
On the design of custom packs: grouping of medical disposable items for surgeries
-
A multivariate approach for top-down project control using earned value management
-
Classification of articles and journals on project control and earned value management
-
Influence of learning in resource-constrained project scheduling
-
- Journal Article
- A1
- open access
Operating theatre modelling: integrating social measures
-
Construction and evaluation framework for a real-life project database
-
Introduction to earned duration
-
Empirical evaluation of earned value management forecasting accuracy for time and cost
-
Developing a framework for statistical process control approaches in project management
-
A new scheduling technique for the resource-constrained project scheduling problem with discounted cash flows
-
The multi-mode resource-constrained project scheduling problem
-
Heuristic methods for the resource availability cost problem
-
Generalized discrete time-cost tradeoff problems
-
Blended learning in project management experiences on busineß games and case studies
-
- Journal Article
- A4
- open access
Classroom expriments on project management communication
-
- Journal Article
- A2
- open access
Controlling projects
-
- Journal Article
- A2
- open access
On the use of schedule risk analysis for project management
-
Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management
-
Gerenciamento integrado de controles de projetos : Primeiro vem a teoria, e então a prática
-
Integrated project management and control: first comes the theory, then the practice
-
- Journal Article
- A1
- open access
Support vector machine regression for project control forecasting
-
The impact of cyclic versus non-cyclic scheduling on the project staffing cost
-
Blended learning in project management: an overview of the operations research & scheduling group
-
Praise youth and it will prosper: PMI Belgium's recognition of young PM potential
-
Teaching integrated project management and control: enhancing student learning and engagement
-
Managing cost and earned value
-
An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
-
Analysis of the integration of the Physician Rostering Problem and the Surgery Scheduling Problem
-
Scheduling of unrelated parallel machines with limited server availability on multiple production locations: a case study in knitted fabrics
-
- Journal Article
- A1
- open access
Setting tolerance limits for statistical project control using earned value management
-
Payment models and net present value optimisation for project scheduling
-
A hybrid electromagnetism-like mechanism/tabu search procedure for the single machine scheduling problem with a maximum lateness objective
-
Reconstructing nurse schedules: computational insights in the problem size parameters
-
An artificial immune system algorithm for the resource availability cost problem
-
An integrated nurse staffing and scheduling analysis for longer-term nursing staff allocation problems
-
Project management using dynamic scheduling: baseline scheduling, risk analysis and project control
-
- Miscellaneous
- open access
Welcome to OR&S! Where students, academics and professionals come together
(2013) -
Integrated project controls: using operations research methods to improve the efficiency of project control
-
- Journal Article
- A2
- open access
An overview of recent research results and future research avenues using simulation studies in project management
-
Project baseline scheduling: an overview of past experiences
-
An artificial immune system based approach for solving the nurse re-rostering system
-
An exact procedure for an integrated project staffing problem
-
An empirical investigation of different solution strategies for meta-heuristic optimization: solution representation, diversity and space reduction
-
The impact of project schedule adherence and rework on the duration forecast accuracy of earned value metrics
-
Analyzing the nursing organizational structure and process from a scheduling perspective
-
Project management with dynamic scheduling: Baseline scheduling, risk analysis and project control
(2012) -
A mathematical programming approach for the integrated physician and surgery scheduling problem
-
If time is money, accuracy pays dividends: an overview of past and future project management research
-
An integrated project control process for research and practice
-
Dynamic pricing with predefined tariff constraints
-
- Journal Article
- A4
- open access
Dynamic scheduling: integrating schedule risk analysis with earned value management
-
An integrated solution procedure for project staffing
-
Genetic algorithms for single machines scheduling problems: a trade-off between intensifications and diversification
-
Solving the integrated physician and surgery scheduling problem under stochastic demand
-
An invasive weed optimization algorithm for the resource availability cost problem
-
General remarks on the effectiveness of earned value schedule control
-
Business games in integrated project control: the project scheduling game
-
A new simulation approach to earned value management forecasting
-
Simulating time/cost trade-offs with uncertainty: a student experiment
-
A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups
-
Measuring the efficiency of project control using fictitious and empirical project data
-
A study on statistical techniques for project control
-
A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions
-
Operations research and dynamic scheduling: when research meets practice
-
Statistical project control in project management: what can simulations teach us?
-
A hybrid heuristic for the machine scheduling problem with parallel machines
-
An efficient solution method for the resource availability cost problem
-
Combined surgery scheduling and physician rostering
-
A genetic algorithm procedure for the time-constrained project scheduling problem
-
- Journal Article
- A4
- open access
Adding value to earned value analysis
-
On the dynamic use of project performance and schedule risk information during project tracking
-
- Conference Paper
- C3
- open access
Project scheduling and staffing with a multi-skilled workforce
-
Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
-
An evolutionary approach for the nurse rerostering problem
-
Days on and days off scheduling of pilots under a variable workload
-
Reactive personnel scheduling: insights and policy decisions
-
- Conference Paper
- P1
- open access
A hybrid dual-population genetic algorithm for the single machine maximum lateness problem
-
A hybrid single and dual population search procedure for the job shop scheduling problem
-
Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber
-
Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
-
Introducing optimization techniques to students: an exam case distribution model
-
Managerial insight in reactive personnel re-rostering
-
Dynamic scheduling on your desktop
(2010) -
A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
-
Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem
-
Using activity sensitivity and network topology information to monitor project time performance.
-
A hybrid scatter search heuristic for personalized crew rostering in the airline industry.
-
Measuring time: An earned value performance management study.
-
Measuring time: improving project performance using earned value management
-
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
-
Static and dynamic determinants of earned value based time forecast accuracy
-
Pilot crew rostering at Brussels Airlines: feasibility study and policy decisions
-
- Conference Paper
- C1
- open access
Reactive nurse scheduling in hospitals
-
On the characterization and generation of nurse scheduling problem instances
-
A finite-capacity production scheduling procedure for a Belgian steel company
-
An artificial immune system for the multi-mode resource-constrained project scheduling problem
-
A genetic algorithm for net present value maximization for resource constrained projects
-
Forecasting a project’s duration under various topological structures
-
The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach
-
Project tracking and control: can we measure the time?
-
Measuring the accuracy of earned value/earned schedule forecasting predictors
-
Earned value forecast accuracy and activity criticality
-
Measuring time using novel earned value management metrics
-
Hybridized scatter search heuristic for the multi-mode RCPSP
(2008) -
A comparison of various population-based meta-heuristics to solve the MRCPSP
-
Measuring time: a simulation study of earned value metrics to forecast the total project duration
-
A simulation study of earned value metrics to forecast the total project duration
-
Measuring time: static and dynamic determinants of earned value based time forecast accuracy
-
Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors
-
Setup times and fast tracking in resource-constrained project scheduling
-
The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects
-
Comparison and hybridization of crossover operators for the nurse scheduling problem
-
An evaluation of the adequacy of project network generators with systematically sampled networks
-
A hybrid scatter search for the airline crew rostering problem
-
NSPLib: a Nurse Scheduling Problem Library: a tool to evaluate (meta-)heuristic procedures
-
A branch-and-price procedure for nurse staffing incorporating roster preferences
-
An efficient heuristic procedure for the resource availability cost problem
-
A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem.
-
An heuristic procedure for the Resource Constrained Project Scheduling Problem with various activity assumptions
(2007) -
The discrete time/cost trade-off problem: extensions and heuristic procedures
-
A simulation and evaluation of earned value metrics to forecast the project duration
-
An electromagnetic meta-heuristic for the nurse scheduling problem
-
A simulation analysis of interactions among errors in costing systems
-
De studie naar kwaliteit: een levenslange garantie
-
Work continuity optimization for the Westerscheldetunnel project in the Netherlands
-
Comparison of meta-heuristic procedures for the nurse scheduling problem
-
A Comparison of Different Project Duration Forecasting Methods using Earned Value Metrics
-
New computational results for the nurse scheduling problem: A scatter search algorithm
-
An efficient hybrid search algorithm for various optimization problems
-
Work continuity constraints in project scheduling
-
Waarschuwingsystemen: veel te vroeg of net te laat?
-
Waar zit het tijdsaspect in een 'earned value'-meetsysteem?
-
Scheduling an R&D project with quality-dependent time slots
-
The electromagnetism meta-heuristic applied to the resource-constrained project scheduling problem
-
Future research avenues for resource-constrained project scheduling: search space restriction or neighbourhood search extension?
-
The impact of parallel processing and set-up times on pre-emptive resource-constrained project scheduling
-
A Bi-population based genetic algorithm for the resource-constrained project scheduling problem
-
New computational results for the discrete time/cost trade-off problem with time-switch constraints
-
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
-
Supply chain management: waar de klant nog steeds koning is
-
The project scheduling game (PSG): simulating time/cost trade-offs in projects
-
An electromagnetic meta-heuristic for the nurse scheduling problem
-
An electromagnetism meta-heuristic for project scheduling
-
Exact and heuristic procedures for the discrete time/cost trade-off problem under various assumptions
(2004) -
Population based meta-heuristic approaches for the resource-constrained project scheduling problem
(2004)