Using Schedule Risk Analysis with resource constraints for project control

Jie Song (UGent) , Annelies Martens (UGent) and Mario Vanhoucke (UGent)
Author
Organization
Keywords
TRADE-OFF, ACTIVITY SENSITIVITY, TIME, IMPACT, INFORMATION, CRITICALITY, HEURISTICS, MANAGEMENT, DURATION, CLASSIFICATION, Project management, Project control, Resource-constrained, Schedule Risk, Analysis, Simulation

Downloads

  • (...).pdf
    • full text (Published version)
    • |
    • UGent only
    • |
    • PDF
    • |
    • 2.19 MB

Citation

Please use this url to cite or link to this publication:

MLA
Song, Jie, et al. “Using Schedule Risk Analysis with Resource Constraints for Project Control.” EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 288, no. 3, 2021, pp. 736–52, doi:10.1016/j.ejor.2020.06.015.
APA
Song, J., Martens, A., & Vanhoucke, M. (2021). Using Schedule Risk Analysis with resource constraints for project control. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 288(3), 736–752. https://doi.org/10.1016/j.ejor.2020.06.015
Chicago author-date
Song, Jie, Annelies Martens, and Mario Vanhoucke. 2021. “Using Schedule Risk Analysis with Resource Constraints for Project Control.” EUROPEAN JOURNAL OF OPERATIONAL RESEARCH 288 (3): 736–52. https://doi.org/10.1016/j.ejor.2020.06.015.
Chicago author-date (all authors)
Song, Jie, Annelies Martens, and Mario Vanhoucke. 2021. “Using Schedule Risk Analysis with Resource Constraints for Project Control.” EUROPEAN JOURNAL OF OPERATIONAL RESEARCH 288 (3): 736–752. doi:10.1016/j.ejor.2020.06.015.
Vancouver
1.
Song J, Martens A, Vanhoucke M. Using Schedule Risk Analysis with resource constraints for project control. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. 2021;288(3):736–52.
IEEE
[1]
J. Song, A. Martens, and M. Vanhoucke, “Using Schedule Risk Analysis with resource constraints for project control,” EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 288, no. 3, pp. 736–752, 2021.
@article{8686332,
  author       = {{Song, Jie and Martens, Annelies and Vanhoucke, Mario}},
  issn         = {{0377-2217}},
  journal      = {{EUROPEAN JOURNAL OF OPERATIONAL RESEARCH}},
  keywords     = {{TRADE-OFF,ACTIVITY SENSITIVITY,TIME,IMPACT,INFORMATION,CRITICALITY,HEURISTICS,MANAGEMENT,DURATION,CLASSIFICATION,Project management,Project control,Resource-constrained,Schedule Risk,Analysis,Simulation}},
  language     = {{eng}},
  number       = {{3}},
  pages        = {{736--752}},
  title        = {{Using Schedule Risk Analysis with resource constraints for project control}},
  url          = {{http://doi.org/10.1016/j.ejor.2020.06.015}},
  volume       = {{288}},
  year         = {{2021}},
}

Altmetric
View in Altmetric
Web of Science
Times cited: