An agency perspective for multi-mode project scheduling with time/cost trade-offs

Tarik Aouam (UGent) and Mario Vanhoucke (UGent)
Author
Organization
Abstract
Project scheduling takes the perspective of a single decision-maker, where the owner is directly involved in the management and control of the project. In this paper, we study the multi-mode project scheduling problem from an agency perspective, where agency arises from the risk-averse contractor's hidden effort, which influences the duration and cost of project activities. We formulate the owner's problem of determining the optimal parameters of a linear incentive contract as a bi-level program, where the lower level is a multi-mode project scheduling problem with time/cost trade-offs, representing the contractor's problem. Two benchmarks for the optimal contract are formulated, providing bounds on the expected total cost to the owner, and performance measures are defined accordingly. A stylized model of the owner's problem is presented and solved in closed form for the simple case where an aggregate effort can be exerted at the project level, with restrictive assumptions on the variance of noise and the cost of effort. However, when effort is exerted at the activity level, solving the owner's problem involves the solution of the multi-mode project scheduling problem. A numerical study for such situation is presented, which illustrates the trade-off between incentives and risk, and the effect of this trade-off on different project related costs. The findings from the stylized model and those from the numerical results of the presented example are compared in a computational experiment on 15 randomly generated projects. (C) 2019 Elsevier Ltd. All rights reserved.
Keywords
Management Science and Operations Research, Modelling and Simulation, General Computer Science, Linear incentive contracts, Risk/incentive trade-offs, Multi-mode project scheduling, Time/cost trade-offs, INCENTIVE CONTRACT DESIGN, NET PRESENT VALUE, DISCRETE, UNCERTAINTY, COMPLEXITY, PROVISION, MODELS, IMPACT

Downloads

  • (...).pdf
    • full text
    • |
    • UGent only
    • |
    • PDF
    • |
    • 4.62 MB

Citation

Please use this url to cite or link to this publication:

MLA
Aouam, Tarik, and Mario Vanhoucke. “An Agency Perspective for Multi-mode Project Scheduling with Time/cost Trade-offs.” COMPUTERS & OPERATIONS RESEARCH 105 (2019): 167–186. Print.
APA
Aouam, T., & Vanhoucke, M. (2019). An agency perspective for multi-mode project scheduling with time/cost trade-offs. COMPUTERS & OPERATIONS RESEARCH, 105, 167–186.
Chicago author-date
Aouam, Tarik, and Mario Vanhoucke. 2019. “An Agency Perspective for Multi-mode Project Scheduling with Time/cost Trade-offs.” Computers & Operations Research 105: 167–186.
Chicago author-date (all authors)
Aouam, Tarik, and Mario Vanhoucke. 2019. “An Agency Perspective for Multi-mode Project Scheduling with Time/cost Trade-offs.” Computers & Operations Research 105: 167–186.
Vancouver
1.
Aouam T, Vanhoucke M. An agency perspective for multi-mode project scheduling with time/cost trade-offs. COMPUTERS & OPERATIONS RESEARCH. Elsevier ; 2019;105:167–86.
IEEE
[1]
T. Aouam and M. Vanhoucke, “An agency perspective for multi-mode project scheduling with time/cost trade-offs,” COMPUTERS & OPERATIONS RESEARCH, vol. 105, pp. 167–186, 2019.
@article{8599081,
  abstract     = {Project scheduling takes the perspective of a single decision-maker, where the owner is directly involved in the management and control of the project. In this paper, we study the multi-mode project scheduling problem from an agency perspective, where agency arises from the risk-averse contractor's hidden effort, which influences the duration and cost of project activities. We formulate the owner's problem of determining the optimal parameters of a linear incentive contract as a bi-level program, where the lower level is a multi-mode project scheduling problem with time/cost trade-offs, representing the contractor's problem. Two benchmarks for the optimal contract are formulated, providing bounds on the expected total cost to the owner, and performance measures are defined accordingly. A stylized model of the owner's problem is presented and solved in closed form for the simple case where an aggregate effort can be exerted at the project level, with restrictive assumptions on the variance of noise and the cost of effort. However, when effort is exerted at the activity level, solving the owner's problem involves the solution of the multi-mode project scheduling problem. A numerical study for such situation is presented, which illustrates the trade-off between incentives and risk, and the effect of this trade-off on different project related costs. The findings from the stylized model and those from the numerical results of the presented example are compared in a computational experiment on 15 randomly generated projects. (C) 2019 Elsevier Ltd. All rights reserved.},
  author       = {Aouam, Tarik and Vanhoucke, Mario},
  issn         = {0305-0548},
  journal      = {COMPUTERS & OPERATIONS RESEARCH},
  keywords     = {Management Science and Operations Research,Modelling and Simulation,General Computer Science,Linear incentive contracts,Risk/incentive trade-offs,Multi-mode project scheduling,Time/cost trade-offs,INCENTIVE CONTRACT DESIGN,NET PRESENT VALUE,DISCRETE,UNCERTAINTY,COMPLEXITY,PROVISION,MODELS,IMPACT},
  language     = {eng},
  pages        = {167--186},
  publisher    = {Elsevier },
  title        = {An agency perspective for multi-mode project scheduling with time/cost trade-offs},
  url          = {http://dx.doi.org/10.1016/j.cor.2019.01.012},
  volume       = {105},
  year         = {2019},
}

Altmetric
View in Altmetric
Web of Science
Times cited: