Advanced search
1 file | 1.57 MB Add to list

Incentive contract design for projects : the owner׳s perspective

Author
Organization
Keywords
Strategy, Decision Making, Incentives, Project Management, Contracting, TRADEOFF, TIME, QUALITY, PERFORMANCE, MULTIOBJECTIVE OPTIMIZATION, INCENTIVE/DISINCENTIVE CONTRACTS, CHINESE CONSTRUCTION-INDUSTRY, TARGET COST CONTRACTS, HIGHWAY CONSTRUCTION, PARTICLE SWARM OPTIMIZATION

Downloads

  • (...).pdf
    • full text
    • |
    • UGent only
    • |
    • PDF
    • |
    • 1.57 MB

Citation

Please use this url to cite or link to this publication:

MLA
Kerkhove, Louis-Philippe, and Mario Vanhoucke. “Incentive Contract Design for Projects : The Owner׳s Perspective.” OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, vol. 62, 2016, pp. 93–114, doi:10.1016/j.omega.2015.09.002.
APA
Kerkhove, L.-P., & Vanhoucke, M. (2016). Incentive contract design for projects : the owner׳s perspective. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 62, 93–114. https://doi.org/10.1016/j.omega.2015.09.002
Chicago author-date
Kerkhove, Louis-Philippe, and Mario Vanhoucke. 2016. “Incentive Contract Design for Projects : The Owner׳s Perspective.” OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE 62: 93–114. https://doi.org/10.1016/j.omega.2015.09.002.
Chicago author-date (all authors)
Kerkhove, Louis-Philippe, and Mario Vanhoucke. 2016. “Incentive Contract Design for Projects : The Owner׳s Perspective.” OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE 62: 93–114. doi:10.1016/j.omega.2015.09.002.
Vancouver
1.
Kerkhove L-P, Vanhoucke M. Incentive contract design for projects : the owner׳s perspective. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE. 2016;62:93–114.
IEEE
[1]
L.-P. Kerkhove and M. Vanhoucke, “Incentive contract design for projects : the owner׳s perspective,” OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, vol. 62, pp. 93–114, 2016.
@article{7098982,
  author       = {{Kerkhove, Louis-Philippe and Vanhoucke, Mario}},
  issn         = {{0305-0483}},
  journal      = {{OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE}},
  keywords     = {{Strategy,Decision Making,Incentives,Project Management,Contracting,TRADEOFF,TIME,QUALITY,PERFORMANCE,MULTIOBJECTIVE OPTIMIZATION,INCENTIVE/DISINCENTIVE CONTRACTS,CHINESE CONSTRUCTION-INDUSTRY,TARGET COST CONTRACTS,HIGHWAY CONSTRUCTION,PARTICLE SWARM OPTIMIZATION}},
  language     = {{eng}},
  pages        = {{93--114}},
  title        = {{Incentive contract design for projects : the owner׳s perspective}},
  url          = {{http://dx.doi.org/10.1016/j.omega.2015.09.002}},
  volume       = {{62}},
  year         = {{2016}},
}

Altmetric
View in Altmetric
Web of Science
Times cited: