A resource type analysis of the integrated project scheduling and personnel staffing problem

Broos Maenhout UGent and Mario Vanhoucke UGent (2017) ANNALS OF OPERATIONS RESEARCH. 252(2). p.407-433
abstract
In the integrated project scheduling and personnel staffing problem the project activities are scheduled and simultaneously a staffing plan is composed to carry out a single project. In this way, the project schedule that leads to the staffing plan with minimum cost is determined. In this paper, we evaluate different scheduling policies and practices for different personnel resource types. We examine the impact on the staffing cost when the personnel resources are scheduled in a cyclic versus a non-cyclic manner for different (days on, days off)-patterns. Furthermore, the impact of introducing more flexible resource types, such as overtime and temporary help, is explored in relationship with the activity resource demand variability. Computational results show that non-cyclic scheduling leads to a considerable lower staffing cost under all circumstances compared to cyclic scheduling. However, despite the tractability of the resource requirements, flexible temporary resources are essential on top of the regular personnel resources to respond to the variability in demand. The addition of overtime on a strategic staffing level only marginally decreases the personnel cost.
Please use this url to cite or link to this publication:
author
organization
year
type
journalArticle (original)
publication status
published
subject
keyword
Manpower planning Project scheduling Cyclic scheduling Non-cyclic scheduling
journal title
ANNALS OF OPERATIONS RESEARCH
volume
252
issue
2
pages
407 - 433
publisher
Springer-Verlag
Web of Science type
Article
Web of Science id
000400542400010
ISSN
0254-5330
DOI
10.1007/s10479-015-2033-z
project
Fonds Wetenschappelijk Onderzoek Vlaanderen (FWO), Belgium, under Contract Number G015711N
language
English
UGent publication?
yes
classification
A1
copyright statement
I have transferred the copyright for this publication to the publisher
id
6959691
handle
http://hdl.handle.net/1854/LU-6959691
date created
2015-10-14 09:53:25
date last changed
2018-03-12 08:38:51
@article{6959691,
  abstract     = {In the integrated project scheduling and personnel staffing problem the project activities are scheduled and simultaneously a staffing plan is composed to carry out a single project. In this way, the project schedule that leads to the staffing plan with minimum cost is determined. In this paper, we evaluate different scheduling policies and practices for different personnel resource types. We examine the impact on the staffing cost when the personnel resources are scheduled in a cyclic versus a non-cyclic manner for different (days on, days off)-patterns. Furthermore, the impact of introducing more flexible resource types, such as overtime and temporary help, is explored in relationship with the activity resource demand variability. Computational results show that non-cyclic scheduling leads to a considerable lower staffing cost under all circumstances compared to cyclic scheduling. However, despite the tractability of the resource requirements, flexible temporary resources are essential on top of the regular personnel resources to respond to the variability in demand. The addition of overtime on a strategic staffing level only marginally decreases the personnel cost.},
  author       = {Maenhout, Broos and Vanhoucke, Mario},
  issn         = {0254-5330 },
  journal      = {ANNALS OF OPERATIONS RESEARCH},
  keyword      = {Manpower planning Project scheduling Cyclic scheduling Non-cyclic scheduling},
  language     = {eng},
  number       = {2},
  pages        = {407--433},
  publisher    = {Springer-Verlag},
  title        = {A resource type analysis of the integrated project scheduling and personnel staffing problem},
  url          = {http://dx.doi.org/10.1007/s10479-015-2033-z},
  volume       = {252},
  year         = {2017},
}

Chicago
Maenhout, Broos, and Mario Vanhoucke. 2017. “A Resource Type Analysis of the Integrated Project Scheduling and Personnel Staffing Problem.” Annals of Operations Research 252 (2): 407–433.
APA
Maenhout, B., & Vanhoucke, M. (2017). A resource type analysis of the integrated project scheduling and personnel staffing problem. ANNALS OF OPERATIONS RESEARCH, 252(2), 407–433.
Vancouver
1.
Maenhout B, Vanhoucke M. A resource type analysis of the integrated project scheduling and personnel staffing problem. ANNALS OF OPERATIONS RESEARCH. Springer-Verlag; 2017;252(2):407–33.
MLA
Maenhout, Broos, and Mario Vanhoucke. “A Resource Type Analysis of the Integrated Project Scheduling and Personnel Staffing Problem.” ANNALS OF OPERATIONS RESEARCH 252.2 (2017): 407–433. Print.