The impact of parallel processing and set-up times on pre-emptive resource-constrained project scheduling

Author
Organization
Keywords
impact, project scheduling, resource-constrained

Citation

Please use this url to cite or link to this publication:

Chicago
Debels, Dieter, and Mario Vanhoucke. 2006. “The Impact of Parallel Processing and Set-up Times on Pre-emptive Resource-constrained Project Scheduling.” In European Conference on Operational Research, 21st, Abstracts.
APA
Debels, D., & Vanhoucke, M. (2006). The impact of parallel processing and set-up times on pre-emptive resource-constrained project scheduling. European Conference on Operational Research, 21st, Abstracts. Presented at the the 21st European conference on Operational Research (EURO XXI).
Vancouver
1.
Debels D, Vanhoucke M. The impact of parallel processing and set-up times on pre-emptive resource-constrained project scheduling. European Conference on Operational Research, 21st, Abstracts. 2006.
MLA
Debels, Dieter, and Mario Vanhoucke. “The Impact of Parallel Processing and Set-up Times on Pre-emptive Resource-constrained Project Scheduling.” European Conference on Operational Research, 21st, Abstracts. 2006. Print.
@inproceedings{670117,
  author       = {Debels, Dieter and Vanhoucke, Mario},
  booktitle    = {European Conference on Operational Research, 21st, Abstracts},
  keyword      = {impact,project scheduling,resource-constrained},
  language     = {eng},
  location     = {Reykjavik, Iceland},
  title        = {The impact of parallel processing and set-up times on pre-emptive resource-constrained project scheduling},
  year         = {2006},
}