Advanced search
1 file | 329.63 KB Add to list

Migrating the fair share algorithm from a distribution to a production planning environment

Author
Organization
Keywords
two-level scheduling, MULTISTAGE, fair share algorithm, cylic scheduling, manufacturing

Downloads

  • (...).pdf
    • full text
    • |
    • UGent only
    • |
    • PDF
    • |
    • 329.63 KB

Citation

Please use this url to cite or link to this publication:

MLA
Van den broecke, Frank, El-Houssaine Aghezzaf, and Hendrik Van Landeghem. “Migrating the Fair Share Algorithm from a Distribution to a Production Planning Environment.” ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING 24.4 (2008): 553–561. Print.
APA
Van den broecke, F., Aghezzaf, E.-H., & Van Landeghem, H. (2008). Migrating the fair share algorithm from a distribution to a production planning environment. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 24(4), 553–561. Presented at the 3rd International conference on Manufacturing Research.
Chicago author-date
Van den broecke, Frank, El-Houssaine Aghezzaf, and Hendrik Van Landeghem. 2008. “Migrating the Fair Share Algorithm from a Distribution to a Production Planning Environment.” Robotics and Computer-integrated Manufacturing 24 (4): 553–561.
Chicago author-date (all authors)
Van den broecke, Frank, El-Houssaine Aghezzaf, and Hendrik Van Landeghem. 2008. “Migrating the Fair Share Algorithm from a Distribution to a Production Planning Environment.” Robotics and Computer-integrated Manufacturing 24 (4): 553–561.
Vancouver
1.
Van den broecke F, Aghezzaf E-H, Van Landeghem H. Migrating the fair share algorithm from a distribution to a production planning environment. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING. 2008;24(4):553–61.
IEEE
[1]
F. Van den broecke, E.-H. Aghezzaf, and H. Van Landeghem, “Migrating the fair share algorithm from a distribution to a production planning environment,” ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, vol. 24, no. 4, pp. 553–561, 2008.
@article{419207,
  author       = {{Van den broecke, Frank and Aghezzaf, El-Houssaine and Van Landeghem, Hendrik}},
  issn         = {{0736-5845}},
  journal      = {{ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING}},
  keywords     = {{two-level scheduling,MULTISTAGE,fair share algorithm,cylic scheduling,manufacturing}},
  language     = {{eng}},
  location     = {{Cranfield, UK}},
  number       = {{4}},
  pages        = {{553--561}},
  title        = {{Migrating the fair share algorithm from a distribution to a production planning environment}},
  url          = {{http://dx.doi.org/10.1016/j.rcim.2007.07.006}},
  volume       = {{24}},
  year         = {{2008}},
}

Altmetric
View in Altmetric
Web of Science
Times cited: