
Migrating the fair share algorithm from a distribution to a production planning environment
- Author
- Frank Van den broecke (UGent) , El-Houssaine Aghezzaf (UGent) and Hendrik Van Landeghem (UGent)
- Organization
- Keywords
- two-level scheduling, MULTISTAGE, fair share algorithm, cylic scheduling, manufacturing
Downloads
-
(...).pdf
- full text
- |
- UGent only
- |
- |
- 329.63 KB
Citation
Please use this url to cite or link to this publication: http://hdl.handle.net/1854/LU-419207
- MLA
- Van den broecke, Frank, et al. “Migrating the Fair Share Algorithm from a Distribution to a Production Planning Environment.” ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, vol. 24, no. 4, 2008, pp. 553–61, doi:10.1016/j.rcim.2007.07.006.
- APA
- Van den broecke, F., Aghezzaf, E.-H., & Van Landeghem, H. (2008). Migrating the fair share algorithm from a distribution to a production planning environment. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 24(4), 553–561. https://doi.org/10.1016/j.rcim.2007.07.006
- Chicago author-date
- Van den broecke, Frank, El-Houssaine Aghezzaf, and Hendrik Van Landeghem. 2008. “Migrating the Fair Share Algorithm from a Distribution to a Production Planning Environment.” ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING 24 (4): 553–61. https://doi.org/10.1016/j.rcim.2007.07.006.
- Chicago author-date (all authors)
- Van den broecke, Frank, El-Houssaine Aghezzaf, and Hendrik Van Landeghem. 2008. “Migrating the Fair Share Algorithm from a Distribution to a Production Planning Environment.” ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING 24 (4): 553–561. doi:10.1016/j.rcim.2007.07.006.
- Vancouver
- 1.Van den broecke F, Aghezzaf E-H, Van Landeghem H. Migrating the fair share algorithm from a distribution to a production planning environment. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING. 2008;24(4):553–61.
- IEEE
- [1]F. Van den broecke, E.-H. Aghezzaf, and H. Van Landeghem, “Migrating the fair share algorithm from a distribution to a production planning environment,” ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, vol. 24, no. 4, pp. 553–561, 2008.
@article{419207, author = {{Van den broecke, Frank and Aghezzaf, El-Houssaine and Van Landeghem, Hendrik}}, issn = {{0736-5845}}, journal = {{ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING}}, keywords = {{two-level scheduling,MULTISTAGE,fair share algorithm,cylic scheduling,manufacturing}}, language = {{eng}}, location = {{Cranfield, UK}}, number = {{4}}, pages = {{553--561}}, title = {{Migrating the fair share algorithm from a distribution to a production planning environment}}, url = {{http://dx.doi.org/10.1016/j.rcim.2007.07.006}}, volume = {{24}}, year = {{2008}}, }
- Altmetric
- View in Altmetric
- Web of Science
- Times cited: