Advanced search
1 file | 856.49 KB

Geometry optimization of an overtopping wave energy device implemented into the new breakwater of the hantsholm port expansion

Author
Organization

Downloads

  • (...).pdf
    • full text
    • |
    • UGent only
    • |
    • PDF
    • |
    • 856.49 KB

Citation

Please use this url to cite or link to this publication:

Chicago
Margheritini, L, Vicky Stratigaki, and Peter Troch. 2012. “Geometry Optimization of an Overtopping Wave Energy Device Implemented into the New Breakwater of the Hantsholm Port Expansion.” In The Proceedings of the International Offshore and Polar Engineering Conference, 593–600.
APA
Margheritini, L, Stratigaki, V., & Troch, P. (2012). Geometry optimization of an overtopping wave energy device implemented into the new breakwater of the hantsholm port expansion. The proceedings of the International Offshore and Polar Engineering Conference (pp. 593–600). Presented at the International offshore and polar engineering conference (ISOPE - 2012).
Vancouver
1.
Margheritini L, Stratigaki V, Troch P. Geometry optimization of an overtopping wave energy device implemented into the new breakwater of the hantsholm port expansion. The proceedings of the International Offshore and Polar Engineering Conference. 2012. p. 593–600.
MLA
Margheritini, L, Vicky Stratigaki, and Peter Troch. “Geometry Optimization of an Overtopping Wave Energy Device Implemented into the New Breakwater of the Hantsholm Port Expansion.” The Proceedings of the International Offshore and Polar Engineering Conference. 2012. 593–600. Print.
@inproceedings{3240049,
  author       = {Margheritini, L and Stratigaki, Vicky and Troch, Peter},
  booktitle    = {The proceedings of the International Offshore and Polar Engineering Conference},
  isbn         = {9781880653944},
  issn         = {1098-6189},
  language     = {eng},
  location     = {Rhodos, Greece},
  pages        = {593--600},
  title        = {Geometry optimization of an overtopping wave energy device implemented into the new breakwater of the hantsholm port expansion},
  year         = {2012},
}