Broos Maenhout (UGent) and Mario Vanhoucke (UGent)
Author
Organization
Abstract
We study a strategic scheduling problem that integrates project scheduling and personnel staffing in order to determine how to staff and schedule single projects as best as possible. A decision is made on the best mix of resource types (regular workers, overtime and temporal workers) to carry out a single project. In this perspective, we want to determine the project schedule and deadline and the usage of the different resources in order to minimize the total cost.
Keywords
Project scheduling, Personnel staffing

Citation

Please use this url to cite or link to this publication:

MLA
Maenhout, Broos, and Mario Vanhoucke. “An Integrated Solution Procedure for Project Staffing.” Operational Research, 25th European Conference, Abstracts, 2012.
APA
Maenhout, B., & Vanhoucke, M. (2012). An integrated solution procedure for project staffing. Operational Research, 25th European Conference, Abstracts. Presented at the 25th European conference on Operational Research (EURO XXV ; EURO 2012), Vilnius, Lithuania.
Chicago author-date
Maenhout, Broos, and Mario Vanhoucke. 2012. “An Integrated Solution Procedure for Project Staffing.” In Operational Research, 25th European Conference, Abstracts.
Chicago author-date (all authors)
Maenhout, Broos, and Mario Vanhoucke. 2012. “An Integrated Solution Procedure for Project Staffing.” In Operational Research, 25th European Conference, Abstracts.
Vancouver
1.
Maenhout B, Vanhoucke M. An integrated solution procedure for project staffing. In: Operational Research, 25th European conference, Abstracts. 2012.
IEEE
[1]
B. Maenhout and M. Vanhoucke, “An integrated solution procedure for project staffing,” in Operational Research, 25th European conference, Abstracts, Vilnius, Lithuania, 2012.
@inproceedings{3153435,
  abstract     = {{We study a strategic scheduling problem that integrates project scheduling and personnel staffing in order to determine how to staff and schedule single projects as best as possible. A decision is made on the best mix of resource types (regular workers, overtime and temporal workers) to carry out a single project. In this perspective, we want to determine the project schedule and deadline and the usage of the different resources in order to minimize the total cost.}},
  author       = {{Maenhout, Broos and Vanhoucke, Mario}},
  booktitle    = {{Operational Research, 25th European conference, Abstracts}},
  keywords     = {{Project scheduling,Personnel staffing}},
  language     = {{eng}},
  location     = {{Vilnius, Lithuania}},
  title        = {{An integrated solution procedure for project staffing}},
  year         = {{2012}},
}