An integrated solution procedure for project staffing
- Author
- Broos Maenhout (UGent) and Mario Vanhoucke (UGent)
- Organization
- Abstract
- We study a strategic scheduling problem that integrates project scheduling and personnel staffing in order to determine how to staff and schedule single projects as best as possible. A decision is made on the best mix of resource types (regular workers, overtime and temporal workers) to carry out a single project. In this perspective, we want to determine the project schedule and deadline and the usage of the different resources in order to minimize the total cost.
- Keywords
- Project scheduling, Personnel staffing
Citation
Please use this url to cite or link to this publication: http://hdl.handle.net/1854/LU-3153435
- MLA
- Maenhout, Broos, and Mario Vanhoucke. “An Integrated Solution Procedure for Project Staffing.” Operational Research, 25th European Conference, Abstracts, 2012.
- APA
- Maenhout, B., & Vanhoucke, M. (2012). An integrated solution procedure for project staffing. Operational Research, 25th European Conference, Abstracts. Presented at the 25th European conference on Operational Research (EURO XXV ; EURO 2012), Vilnius, Lithuania.
- Chicago author-date
- Maenhout, Broos, and Mario Vanhoucke. 2012. “An Integrated Solution Procedure for Project Staffing.” In Operational Research, 25th European Conference, Abstracts.
- Chicago author-date (all authors)
- Maenhout, Broos, and Mario Vanhoucke. 2012. “An Integrated Solution Procedure for Project Staffing.” In Operational Research, 25th European Conference, Abstracts.
- Vancouver
- 1.Maenhout B, Vanhoucke M. An integrated solution procedure for project staffing. In: Operational Research, 25th European conference, Abstracts. 2012.
- IEEE
- [1]B. Maenhout and M. Vanhoucke, “An integrated solution procedure for project staffing,” in Operational Research, 25th European conference, Abstracts, Vilnius, Lithuania, 2012.
@inproceedings{3153435, abstract = {{We study a strategic scheduling problem that integrates project scheduling and personnel staffing in order to determine how to staff and schedule single projects as best as possible. A decision is made on the best mix of resource types (regular workers, overtime and temporal workers) to carry out a single project. In this perspective, we want to determine the project schedule and deadline and the usage of the different resources in order to minimize the total cost.}}, author = {{Maenhout, Broos and Vanhoucke, Mario}}, booktitle = {{Operational Research, 25th European conference, Abstracts}}, keywords = {{Project scheduling,Personnel staffing}}, language = {{eng}}, location = {{Vilnius, Lithuania}}, title = {{An integrated solution procedure for project staffing}}, year = {{2012}}, }