Ghent University Academic Bibliography

Advanced

Comparison of pipeline girth weld defect acceptance at the onset of yielding according to CSA Z662 and EPRG guidelines

Matthias Verstraete UGent, Wim De Waele UGent, Rudi Denys UGent and Stijn Hertelé UGent (2013) PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 3. p.545-551
abstract
Within a stress-based design context, different codified engineering critical assessment procedures are available for defect assessment. This paper aims at comparing the recently updated EPRG Tier 2 guidelines with the Canadian CSA Z662 Annex K procedure. Therefore, the requirements for both procedure are discussed and the maximum allowable defect dimensions are graphically compared. It is observed that the use of the EPRG guidelines is significantly more restricted in terms of steel grades and pipe geometry. However, within the limits of the EPRG's applicability, the CSA procedure requires significantly more material testing, while resulting in (extremely) low defect acceptance.
Please use this url to cite or link to this publication:
author
organization
year
type
conference
publication status
published
subject
in
PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 3
article_number
IPC2012-90593
pages
545 - 551
publisher
ASME
conference name
9th International Pipeline Conference (IPC - 2012)
conference location
Calgary, Alberta, Canada
conference start
2012-09-24
conference end
2012-09-28
Web of Science type
Proceedings Paper
Web of Science id
000335090800058
ISBN
9780791845141
language
English
UGent publication?
yes
classification
P1
copyright statement
I have transferred the copyright for this publication to the publisher
id
3010028
handle
http://hdl.handle.net/1854/LU-3010028
date created
2012-10-09 14:57:38
date last changed
2014-06-03 11:31:08
@inproceedings{3010028,
  abstract     = {Within a stress-based design context, different codified engineering critical assessment procedures are available for defect assessment. This paper aims at comparing the recently updated EPRG Tier 2 guidelines with the Canadian CSA Z662 Annex K procedure. Therefore, the requirements for both procedure are discussed and the maximum allowable defect dimensions are graphically compared. It is observed that the use of the EPRG guidelines is significantly more restricted in terms of steel grades and pipe geometry. However, within the limits of the EPRG's applicability, the CSA procedure requires significantly more material testing, while resulting in (extremely) low defect acceptance.},
  articleno    = {IPC2012-90593},
  author       = {Verstraete, Matthias and De Waele, Wim and Denys, Rudi and Hertel{\'e}, Stijn},
  booktitle    = {PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 3},
  isbn         = {9780791845141},
  language     = {eng},
  location     = {Calgary, Alberta, Canada},
  pages        = {IPC2012-90593:545--IPC2012-90593:551},
  publisher    = {ASME},
  title        = {Comparison of pipeline girth weld defect acceptance at the onset of yielding according to CSA Z662 and EPRG guidelines},
  year         = {2013},
}

Chicago
Verstraete, Matthias, Wim De Waele, Rudi Denys, and Stijn Hertelé. 2013. “Comparison of Pipeline Girth Weld Defect Acceptance at the Onset of Yielding According to CSA Z662 and EPRG Guidelines.” In PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 3, 545–551. ASME.
APA
Verstraete, M., De Waele, W., Denys, R., & Hertelé, S. (2013). Comparison of pipeline girth weld defect acceptance at the onset of yielding according to CSA Z662 and EPRG guidelines. PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 3 (pp. 545–551). Presented at the 9th International Pipeline Conference (IPC - 2012), ASME.
Vancouver
1.
Verstraete M, De Waele W, Denys R, Hertelé S. Comparison of pipeline girth weld defect acceptance at the onset of yielding according to CSA Z662 and EPRG guidelines. PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 3. ASME; 2013. p. 545–51.
MLA
Verstraete, Matthias, Wim De Waele, Rudi Denys, et al. “Comparison of Pipeline Girth Weld Defect Acceptance at the Onset of Yielding According to CSA Z662 and EPRG Guidelines.” PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 3. ASME, 2013. 545–551. Print.