Advanced search

The role and responsability of the equipment design engineer in the set-up reduction effort.

Author
Organization

Citation

Please use this url to cite or link to this publication:

Chicago
Van Goubergen, Dirk, and Hendrik Van Landeghem. 2001. “The Role and Responsability of the Equipment Design Engineer in the Set-up Reduction Effort.” In Proceedings of the 11th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM’01, 16-18 July 2001, Dublin, Ireland, 975–984.
APA
Van Goubergen, D., & Van Landeghem, H. (2001). The role and responsability of the equipment design engineer in the set-up reduction effort. Proceedings of the 11th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM’01, 16-18 july 2001, Dublin, Ireland (pp. 975–984).
Vancouver
1.
Van Goubergen D, Van Landeghem H. The role and responsability of the equipment design engineer in the set-up reduction effort. Proceedings of the 11th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM’01, 16-18 july 2001, Dublin, Ireland. 2001. p. 975–84.
MLA
Van Goubergen, Dirk, and Hendrik Van Landeghem. “The Role and Responsability of the Equipment Design Engineer in the Set-up Reduction Effort.” Proceedings of the 11th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM’01, 16-18 July 2001, Dublin, Ireland. 2001. 975–984. Print.
@inproceedings{145256,
  author       = {Van Goubergen, Dirk and Van Landeghem, Hendrik},
  booktitle    = {Proceedings of the 11th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM'01, 16-18 july 2001, Dublin, Ireland},
  language     = {eng},
  pages        = {975--984},
  title        = {The role and responsability of the equipment design engineer in the set-up reduction effort.},
  year         = {2001},
}