Advanced search
1 file | 534.47 KB Add to list

A robust hierarchical production planning for a capacitated two-stage production system

Author
Organization
Keywords
Hierarchical production, Robust planning, Cyclical planning, Periodic review, MULTISTAGE, UNCERTAINTY, DISAGGREGATION, DEMANDS, MODEL, LOT-SIZING PROBLEMS, OPTIMIZATION, SERVICE-LEVEL CONSTRAINTS

Downloads

  • (...).pdf
    • full text
    • |
    • UGent only
    • |
    • PDF
    • |
    • 534.47 KB

Citation

Please use this url to cite or link to this publication:

MLA
Aghezzaf, El-Houssaine, Carles Sitompul, and Frank Van den broecke. “A Robust Hierarchical Production Planning for a Capacitated Two-stage Production System.” COMPUTERS & INDUSTRIAL ENGINEERING 60.2 (2011): 361–372. Print.
APA
Aghezzaf, E.-H., Sitompul, C., & Van den broecke, F. (2011). A robust hierarchical production planning for a capacitated two-stage production system. COMPUTERS & INDUSTRIAL ENGINEERING, 60(2), 361–372.
Chicago author-date
Aghezzaf, El-Houssaine, Carles Sitompul, and Frank Van den broecke. 2011. “A Robust Hierarchical Production Planning for a Capacitated Two-stage Production System.” Computers & Industrial Engineering 60 (2): 361–372.
Chicago author-date (all authors)
Aghezzaf, El-Houssaine, Carles Sitompul, and Frank Van den broecke. 2011. “A Robust Hierarchical Production Planning for a Capacitated Two-stage Production System.” Computers & Industrial Engineering 60 (2): 361–372.
Vancouver
1.
Aghezzaf E-H, Sitompul C, Van den broecke F. A robust hierarchical production planning for a capacitated two-stage production system. COMPUTERS & INDUSTRIAL ENGINEERING. 2011;60(2):361–72.
IEEE
[1]
E.-H. Aghezzaf, C. Sitompul, and F. Van den broecke, “A robust hierarchical production planning for a capacitated two-stage production system,” COMPUTERS & INDUSTRIAL ENGINEERING, vol. 60, no. 2, pp. 361–372, 2011.
@article{1260297,
  author       = {{Aghezzaf, El-Houssaine and Sitompul, Carles and Van den broecke, Frank}},
  issn         = {{0360-8352}},
  journal      = {{COMPUTERS & INDUSTRIAL ENGINEERING}},
  keywords     = {{Hierarchical production,Robust planning,Cyclical planning,Periodic review,MULTISTAGE,UNCERTAINTY,DISAGGREGATION,DEMANDS,MODEL,LOT-SIZING PROBLEMS,OPTIMIZATION,SERVICE-LEVEL CONSTRAINTS}},
  language     = {{eng}},
  number       = {{2}},
  pages        = {{361--372}},
  title        = {{A robust hierarchical production planning for a capacitated two-stage production system}},
  url          = {{http://dx.doi.org/10.1016/j.cie.2010.12.005}},
  volume       = {{60}},
  year         = {{2011}},
}

Altmetric
View in Altmetric
Web of Science
Times cited: