Advanced search
1 file | 1.04 MB

Design and construction of a double-curved railway overpass and 3-track tubular arch

Author
Organization

Downloads

    • full text
    • |
    • UGent only
    • |
    • PDF
    • |
    • 1.04 MB

Citation

Please use this url to cite or link to this publication:

Chicago
Van Bogaert, Philippe. 2010. “Design and Construction of a Double-curved Railway Overpass and 3-track Tubular Arch.” In IABSE Venice Symposium Report, 97:564–565. Zürich, Switzerland: IABSE-AIPC-IVBH.
APA
Van Bogaert, Philippe. (2010). Design and construction of a double-curved railway overpass and 3-track tubular arch. IABSE Venice Symposium Report (Vol. 97, pp. 564–565). Presented at the 34th IABSE Symposium : International Association for Bridge and Structural Engineering, Zürich, Switzerland: IABSE-AIPC-IVBH.
Vancouver
1.
Van Bogaert P. Design and construction of a double-curved railway overpass and 3-track tubular arch. IABSE Venice Symposium Report. Zürich, Switzerland: IABSE-AIPC-IVBH; 2010. p. 564–5.
MLA
Van Bogaert, Philippe. “Design and Construction of a Double-curved Railway Overpass and 3-track Tubular Arch.” IABSE Venice Symposium Report. Vol. 97. Zürich, Switzerland: IABSE-AIPC-IVBH, 2010. 564–565. Print.
@inproceedings{1250659,
  author       = {Van Bogaert, Philippe},
  booktitle    = {IABSE Venice Symposium Report},
  isbn         = {9783857481222},
  language     = {eng},
  location     = {Venice, Italy},
  pages        = {564--565},
  publisher    = {IABSE-AIPC-IVBH},
  title        = {Design and construction of a double-curved railway overpass and 3-track tubular arch},
  volume       = {97},
  year         = {2010},
}