Advanced search
1 file | 409.68 KB

Design and construction of double-curved railway overpass and 3-track tubular arch bridge

Author
Organization

Downloads

  • 1250199.pdf
    • full text
    • |
    • open access
    • |
    • PDF
    • |
    • 409.68 KB

Citation

Please use this url to cite or link to this publication:

Chicago
Van Bogaert, Philippe. 2010. “Design and Construction of Double-curved Railway Overpass and 3-track Tubular Arch Bridge.” In 8th International Conference on Short & Medium Span Bridges, Abstracts, ed. F Michael Bartlett, 181–181. Montréal, Canada: The Canadian Society for Civil Engineering.
APA
Van Bogaert, Philippe. (2010). Design and construction of double-curved railway overpass and 3-track tubular arch bridge. In F. M. Bartlett (Ed.), 8th international conference on short & medium span bridges, Abstracts (pp. 181–181). Presented at the 8th International Conference on short & medium span bridges, Montréal, Canada: The Canadian Society for Civil Engineering.
Vancouver
1.
Van Bogaert P. Design and construction of double-curved railway overpass and 3-track tubular arch bridge. In: Bartlett FM, editor. 8th international conference on short & medium span bridges, Abstracts. Montréal, Canada: The Canadian Society for Civil Engineering; 2010. p. 181–181.
MLA
Van Bogaert, Philippe. “Design and Construction of Double-curved Railway Overpass and 3-track Tubular Arch Bridge.” 8th International Conference on Short & Medium Span Bridges, Abstracts. Ed. F Michael Bartlett. Montréal, Canada: The Canadian Society for Civil Engineering, 2010. 181–181. Print.
@inproceedings{1250199,
  author       = {Van Bogaert, Philippe},
  booktitle    = {8th international conference on short & medium span bridges, Abstracts},
  editor       = {Bartlett, F Michael},
  language     = {eng},
  location     = {Niagara Falls},
  pages        = {181--181},
  publisher    = {The Canadian Society for Civil Engineering},
  title        = {Design and construction of double-curved railway overpass and 3-track tubular arch bridge},
  year         = {2010},
}