Monitoring of construction and use of a steel railway bridge with one central arch
-
Ground settlements due to construction of triplet tunnels with different construction arrangements
-
- Conference Paper
- C1
- open access
Combining bored tunnels : optimal construction order of multiple independant shield-driven tunnels
(2018) p.17-25 -
Fire design for the refurbishment of a railway tunnel
-
Refurbishment of masonry arch bridge due to insufficient load capacity
-
Design and project planning of the renovation of a railway line
-
Design and project planning of the renovation of a railway line
-
- Conference Paper
- C3
- open access
Refurbishment of the masonry arch on Merxem street bridge
-
Refurbishment of the masonry arch on Merxem street bridge
-
Framed or triangular brace arrangements in tubular arches