ereprof. dr. ir. Philippe Van Bogaert
Show
Sort by
-
Longitudinal cracking of the lower flange of precambered composite steel and concrete bridge girders
-
Erection by turning steel box girders of the crossing of motorway E 42 and the ‘Canal du Centre’
-
Alternative use of an RC portal frame bridge built in 1941
-
Deminishing classic steel arch bridges' horizontal bracings
-
Adapting slender footbridges to the current requirements of bicycle traffic
-
Reducing the horizontal bracing of historic arch bridges
-
Assessment of heritage value and resistance of a 1935 Vierendeel steel railway bridge
(2025) PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING HISTORY AND HERITAGE. 178(3). p.130-141 -
- Conference Paper
- C1
- open access
Alternative load path avoiding bridge collapse after demolition of a pier by collision
-
- Conference Paper
- C1
- open access
Deformation of end crossbeams of steel bridges related to sustainability of bridge joints
-
Investigation into the cause of cracks and the opportunity to refurbish steel Vierendeel railway bridges